Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 17 Nov 2025 | 70 | Good | Pedro Almeida |
Added to the next renewal programme for scoping.
Miguel CostaGrade 2, index 70. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasAccess needs a lane closure; book overnight.
Miguel CostaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Serra Construções | Workmanship warranty until 31 Jan 2031 |
| Renewal | A23 Beira Interior concession company | End of design life around 2046 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0014: Pavement section at km 93.7, A23 Beira Interior
Condition, people, history and liability for any road asset