Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 8 Nov 2025 | 88 | Very good | Pedro Almeida |
Access needs a lane closure; book overnight.
Miguel CostaMonitoring increased to quarterly until repair.
Miguel CostaGrade 1, index 88. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Serra Construções | Workmanship warranty until 30 Apr 2030 |
| Renewal | A23 Beira Interior concession company | End of design life around 2045 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0030: Pavement section at km 173.5, A23 Beira Interior
Condition, people, history and liability for any road asset