Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 4 Apr 2026 | 88 | Very good | Paula Serrano |
Access needs a lane closure; book overnight.
Carmen OrtegaGrade 1, index 88. Retroreflectivity above minimum; face clean.
Paula Serrano, Castilla IngenieríaMonitoring increased to quarterly until repair.
Carmen OrtegaDamage after a single-vehicle collision. Made safe by patrol; police reference recorded.
Javier Moreno, Meseta MantenimientoToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Meseta Mantenimiento | Operations and maintenance contract, performance-based |
| Defects | Manzanares Obras | Workmanship warranty until 1 Aug 2027 |
| Renewal | Concesiones de Madrid concession company | End of design life around 2029 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Concesiones de Madrid concession company | Grade 3 or better at handback in 2029 |
Forecast to meet the handback standard at the current rate of wear.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Third-party damageRecovery of repair costs after a vehicle strike.CLM-MADRM0004-1 | At-fault driver’s insurer | 7 Oct 2025 | €2,600 | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record MAD-RM-0004: Road markings at km 8.6, Concesiones de Madrid
Condition, people, history and liability for any road asset