| Date | Index | Grade | Inspector |
|---|---|---|---|
| 8 May 2023 | 53 | Fair | Esteban Rojas |
| 7 May 2024 | 45 | Poor | Valeria Mora |
| 7 May 2025 | 42 | Poor | Esteban Rojas |
| 7 May 2026 | 30 | Very poor | Valeria Mora |
Access needs a lane closure; book overnight.
Laura JiménezCategory 2. Repaired within the contract response time.
Diego Vargas, Central Vial CRMonitoring increased to quarterly until repair.
Laura JiménezGrade 5, index 30. Beam height below 600 mm over 40 m; terminal damaged.
Valeria Mora, Meseta Central IngenieríaCategory 1. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRGrade 4, index 42. Beam height below 600 mm over 40 m; terminal damaged.
Esteban Rojas, Meseta Central IngenieríaGrade 4, index 45. Beam height below 600 mm over 40 m; terminal damaged.
Valeria Mora, Meseta Central IngenieríaGrade 3, index 53. Surface corrosion on posts; two bolts missing.
Esteban Rojas, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2037 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-CC-0004: Crash cushion at km 40.9, Ruta 27
Condition, people, history and liability for any road asset