Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 18 Sep 2024 | 88 | Very good | Pedro Almeida |
| 18 Sep 2025 | 80 | Very good | Sofia Pinto |
| 18 Sep 2026 | 74 | Good | Pedro Almeida |
Grade 2, index 74. All functions tested and working.
Pedro Almeida, Estrela Inspeções TécnicasMonitoring increased to quarterly until repair.
Miguel CostaGrade 1, index 80. All functions tested and working.
Sofia Pinto, Estrela Inspeções TécnicasAsset data checked against as-built drawings.
Miguel CostaGrade 1, index 88. All functions tested and working.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Lumenroad | Manufacturer warranty until 29 Apr 2028 |
| Renewal | A23 Beira Interior concession company | End of design life around 2048 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 3 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-LC-0019: Lighting column at km 166.5, A23 Beira Interior
Condition, people, history and liability for any road asset