Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 16 Oct 2022 | 99 | Very good | Pedro Almeida |
| 16 Oct 2023 | 96 | Very good | Sofia Pinto |
| 15 Oct 2024 | 91 | Very good | Pedro Almeida |
| 15 Oct 2025 | 92 | Very good | Sofia Pinto |
| 15 Oct 2026 | 87 | Very good | Pedro Almeida |
Grade 1, index 87. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasAdded to the next renewal programme for scoping.
Miguel CostaGrade 1, index 92. Surface sound, texture depth within limits.
Sofia Pinto, Estrela Inspeções TécnicasAdded to the next renewal programme for scoping.
Miguel CostaGrade 1, index 91. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasGrade 1, index 96. Surface sound, texture depth within limits.
Sofia Pinto, Estrela Inspeções TécnicasGrade 1, index 99. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | A23 Beira Interior concession company | All warranties expired; the concession company carries the risk |
| Renewal | A23 Beira Interior concession company | End of design life around 2041 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0008: Pavement section at km 63.1, A23 Beira Interior
Condition, people, history and liability for any road asset