€260k backlog. 1 element past the intervention threshold.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Primary deck element | Very high | 1A | 1.0 | 1.00 | None |
| Pier or column | Very high | 2C | 2.1 | 2.10 | None |
| Cross-head or capping beam | Very high | 4C | 4.1 | 4.10 | €260k |
| Abutments | High | 1A | 1.0 | 1.00 | None |
| Foundations | High | 2B | 2.0 | 1.78 | None |
| Bearings | High | 2E | 2.7 | 2.53 | None |
| Expansion joints | High | 1A | 1.0 | 1.00 | None |
| Parapets and safety fences | High | 2E | 2.7 | 2.53 | None |
| Waterproofing | Medium | 2D | 2.3 | 1.89 | None |
| Superstructure drainage | Medium | 2B | 2.0 | 1.55 | None |
| Carriageway surfacing | Medium | 2B | 2.0 | 1.55 | None |
| Deck finishes | Medium | 2B | 2.0 | 1.55 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 23 Apr 2009 | 73 | Good | Pedro Almeida |
| 23 Apr 2011 | 73 | Good | Sofia Pinto |
| 22 Apr 2013 | 68 | Good | Pedro Almeida |
| 22 Apr 2015 | 65 | Good | Sofia Pinto |
| 21 Apr 2017 | 64 | Fair | Pedro Almeida |
| 21 Apr 2019 | 63 | Fair | Sofia Pinto |
| 20 Apr 2021 | 60 | Fair | Pedro Almeida |
| 20 Apr 2023 | 84 | Very good | Sofia Pinto |
| 19 Apr 2025 | 82 | Very good | Pedro Almeida |
Added to the next renewal programme for scoping.
Miguel CostaGrade 1, index 82. No significant defects. Bearings and joints performing.
Pedro Almeida, Estrela Inspeções TécnicasDamage after a single-vehicle collision. Made safe by patrol; police reference recorded.
Catarina Gomes, Beira Conservação ViáriaGrade 1, index 84. No significant defects. Bearings and joints performing.
Sofia Pinto, Estrela Inspeções TécnicasCompleted under the renewal programme. Handed over with as-built records.
Catarina Gomes, Pontis StructuralGrade 3, index 60. Minor spalling to deck soffit; joint seals hardening.
Pedro Almeida, Estrela Inspeções TécnicasGrade 3, index 63. Minor spalling to deck soffit; joint seals hardening.
Sofia Pinto, Estrela Inspeções TécnicasGrade 3, index 64. Minor spalling to deck soffit; joint seals hardening.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Pontis Structural | Latent defects cover until 12 Oct 2031 |
| Renewal | A23 Beira Interior concession company | End of design life around 2124 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to meet the handback standard at the current rate of wear.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Third-party damageRecovery of repair costs after a vehicle strike.CLM-A23BR0004-1 | At-fault driver’s insurer | 9 Dec 2024 | €20k | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-BR-0004: Bridge at km 61.0, A23 Beira Interior