| Date | Index | Grade | Inspector |
|---|---|---|---|
| 10 Jul 2024 | 97 | Very good | Pedro Almeida |
| 10 Jul 2025 | 91 | Very good | Sofia Pinto |
| 10 Jul 2026 | 83 | Very good | Pedro Almeida |
Monitoring increased to quarterly until repair.
Miguel CostaGrade 1, index 83. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasAsset data checked against as-built drawings.
Miguel CostaGrade 1, index 91. Surface sound, texture depth within limits.
Sofia Pinto, Estrela Inspeções TécnicasGrade 1, index 97. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Serra Construções | Workmanship warranty until 29 Apr 2028 |
| Renewal | A23 Beira Interior concession company | End of design life around 2043 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0009: Pavement section at km 67.8, A23 Beira Interior