Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 20 Aug 2022 | 94 | Very good | Pedro Almeida |
| 20 Aug 2023 | 88 | Very good | Sofia Pinto |
| 19 Aug 2024 | 81 | Very good | Pedro Almeida |
| 19 Aug 2025 | 75 | Good | Sofia Pinto |
| 19 Aug 2026 | 69 | Good | Pedro Almeida |
Grade 2, index 69. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasAccess needs a lane closure; book overnight.
Miguel CostaAsset data checked against as-built drawings.
Miguel CostaGrade 2, index 75. Surface sound, texture depth within limits.
Sofia Pinto, Estrela Inspeções TécnicasGrade 1, index 81. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasGrade 1, index 88. Surface sound, texture depth within limits.
Sofia Pinto, Estrela Inspeções TécnicasGrade 1, index 94. Surface sound, texture depth within limits.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | A23 Beira Interior concession company | All warranties expired; the concession company carries the risk |
| Renewal | A23 Beira Interior concession company | End of design life around 2041 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0013: Pavement section at km 90.8, A23 Beira Interior
Condition, people, history and liability for any road asset