Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 16 Dec 2024 | 56 | Fair | Sofia Pinto |
| 16 Dec 2025 | 43 | Poor | Pedro Almeida |
Category 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaAccess needs a lane closure; book overnight.
Miguel CostaCategory 1. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaGrade 4, index 43. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Pedro Almeida, Estrela Inspeções TécnicasGrade 3, index 56. Fretting in wheel paths; ravelling at longitudinal joint.
Sofia Pinto, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Serra Construções | Workmanship warranty until 28 Feb 2029 |
| Renewal | A23 Beira Interior concession company | End of design life around 2044 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Warranty claimEarly deterioration notified under the workmanship warranty.CLM-A23PV0021-2 | Serra Construções | 29 Sep 2026 | €184k | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0021: Pavement section at km 131.1, A23 Beira Interior
Condition, people, history and liability for any road asset