| Date | Index | Grade | Inspector |
|---|---|---|---|
| 3 Jan 2024 | 61 | Fair | Pedro Almeida |
| 2 Jan 2025 | 52 | Fair | Sofia Pinto |
| 2 Jan 2026 | 40 | Poor | Pedro Almeida |
Asset data checked against as-built drawings.
Miguel CostaAdded to the next renewal programme for scoping.
Miguel CostaCategory 1. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaGrade 4, index 40. Retroreflectivity below minimum; legend illegible at night.
Pedro Almeida, Estrela Inspeções TécnicasCategory 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaGrade 3, index 52. Retroreflectivity near minimum; face fading.
Sofia Pinto, Estrela Inspeções TécnicasGrade 3, index 61. Retroreflectivity near minimum; face fading.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | A23 Beira Interior concession company | All warranties expired; the concession company carries the risk |
| Renewal | A23 Beira Interior concession company | End of design life around 2027, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 3 or better at handback in 2032 |
Due for renewal before handback; the forecast assumes it is renewed on time.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-RM-0001: Road markings at km 2.4, A23 Beira Interior
Condition, people, history and liability for any road asset