€12k backlog. 2 elements past the intervention threshold, plus €1,500 for the overdue principal inspection.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Primary wall element | Very high | 2E | 2.7 | 2.70 | €8,919 |
| Foundations | High | 2E | 2.7 | 2.53 | None |
| Parapet beam or plinth | High | 2C | 2.1 | 1.88 | None |
| Parapets and safety fences | High | 3C | 3.1 | 2.96 | €1,237 |
| Drainage | Medium | 2D | 2.3 | 1.89 | None |
| Movement joints | Medium | 2D | 2.3 | 1.89 | None |
| Wall finishes | Medium | 2D | 2.3 | 1.89 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 19 Oct 2008 | 72 | Good | Pedro Almeida |
| 19 Oct 2010 | 70 | Good | Sofia Pinto |
| 18 Oct 2012 | 69 | Good | Pedro Almeida |
| 18 Oct 2014 | 66 | Good | Sofia Pinto |
| 17 Oct 2016 | 65 | Good | Pedro Almeida |
| 17 Oct 2018 | 60 | Fair | Sofia Pinto |
| 16 Oct 2020 | 83 | Very good | Pedro Almeida |
| 16 Oct 2022 | 76 | Good | Sofia Pinto |
| 15 Oct 2024 | 74 | Good | Pedro Almeida |
Condition reviewed with the grantor at the quarterly meeting.
Miguel CostaCategory 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaAccess needs a lane closure; book overnight.
Miguel CostaGrade 2, index 74. No significant defects. Bearings and joints performing.
Pedro Almeida, Estrela Inspeções TécnicasGrade 2, index 76. No significant defects. Bearings and joints performing.
Sofia Pinto, Estrela Inspeções TécnicasGrade 1, index 83. No significant defects. Bearings and joints performing.
Pedro Almeida, Estrela Inspeções TécnicasCompleted under the renewal programme. Handed over with as-built records.
Catarina Gomes, Pontis StructuralGrade 3, index 60. Minor spalling to deck soffit; joint seals hardening.
Sofia Pinto, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Pontis Structural | Latent defects cover until 21 Aug 2029 |
| Renewal | A23 Beira Interior concession company | End of design life around 2104 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-RW-0002: Retaining wall at km 59.5, A23 Beira Interior
Condition, people, history and liability for any road asset