Loading asset record…
Loading asset record…
€0 backlog. No element past its intervention threshold.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Culvert barrel | Very high | 2B | 2.0 | 2.00 | None |
| Headwalls | High | 2C | 2.1 | 1.88 | None |
| Wing walls | High | 1A | 1.0 | 1.00 | None |
| Parapet or guardrail | High | 1A | 1.0 | 1.00 | None |
| Revetment | Medium | 1A | 1.0 | 1.00 | None |
| Aprons | Medium | 1A | 1.0 | 1.00 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 20 Nov 2009 | 82 | Very good | Paula Serrano |
| 20 Nov 2011 | 76 | Good | Álvaro Gil |
| 19 Nov 2013 | 79 | Good | Paula Serrano |
| 19 Nov 2015 | 79 | Good | Álvaro Gil |
| 18 Nov 2017 | 74 | Good | Paula Serrano |
| 18 Nov 2019 | 73 | Good | Álvaro Gil |
| 17 Nov 2021 | 71 | Good | Paula Serrano |
| 17 Nov 2023 | 71 | Good | Álvaro Gil |
| 16 Nov 2025 | 93 | Very good | Paula Serrano |
Added to the next renewal programme for scoping.
Carmen OrtegaGrade 1, index 93. No significant defects. Bearings and joints performing.
Paula Serrano, Castilla IngenieríaMonitoring increased to quarterly until repair.
Carmen OrtegaCompleted under the renewal programme. Handed over with as-built records.
Javier Moreno, Pontis StructuralGrade 2, index 71. No significant defects. Bearings and joints performing.
Álvaro Gil, Castilla IngenieríaGrade 2, index 71. No significant defects. Bearings and joints performing.
Paula Serrano, Castilla IngenieríaGrade 2, index 73. No significant defects. Bearings and joints performing.
Álvaro Gil, Castilla IngenieríaGrade 2, index 74. No significant defects. Bearings and joints performing.
Paula Serrano, Castilla IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Meseta Mantenimiento | Operations and maintenance contract, performance-based |
| Defects | Pontis Structural | Latent defects cover until 3 Aug 2034 |
| Renewal | Concesiones de Madrid concession company | End of design life around 2050 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Concesiones de Madrid concession company | Grade 2 or better at handback in 2029 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record MAD-CV-0002: Culvert at km 1.6, Concesiones de Madrid
Condition, people, history and liability for any road asset