Loading asset record…
Loading asset record…
€269k backlog. 2 elements past the intervention threshold.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Primary deck element | Very high | 1A | 1.0 | 1.00 | None |
| Pier or column | Very high | 3D | 3.3 | 3.30 | €190k |
| Cross-head or capping beam | Very high | 1A | 1.0 | 1.00 | None |
| Abutments | High | 2B | 2.0 | 1.78 | None |
| Foundations | High | 1A | 1.0 | 1.00 | None |
| Bearings | High | 2C | 2.1 | 1.88 | None |
| Expansion joints | High | 3B | 3.0 | 2.85 | None |
| Parapets and safety fences | High | 3C | 3.1 | 2.96 | €79k |
| Waterproofing | Medium | 2B | 2.0 | 1.55 | None |
| Superstructure drainage | Medium | 2C | 2.1 | 1.67 | None |
| Carriageway surfacing | Medium | 2D | 2.3 | 1.89 | None |
| Deck finishes | Medium | 3B | 3.0 | 2.70 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 20 Sep 2012 | 71 | Good | Esteban Rojas |
| 20 Sep 2014 | 65 | Good | Valeria Mora |
| 19 Sep 2016 | 65 | Good | Esteban Rojas |
| 19 Sep 2018 | 62 | Fair | Valeria Mora |
| 18 Sep 2020 | 91 | Very good | Esteban Rojas |
| 18 Sep 2022 | 85 | Very good | Valeria Mora |
| 17 Sep 2024 | 86 | Very good | Esteban Rojas |
| 17 Sep 2026 | 82 | Very good | Valeria Mora |
Grade 1, index 82. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaSpares held at the maintenance depot.
Laura JiménezAccess needs a lane closure; book overnight.
Laura JiménezGrade 1, index 86. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaGrade 1, index 85. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaGrade 1, index 91. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaCompleted under the renewal programme. Handed over with as-built records.
Diego Vargas, Pontis StructuralGrade 3, index 62. Minor spalling to deck soffit; joint seals hardening.
Valeria Mora, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Pontis Structural | Latent defects cover until 10 Sep 2029 |
| Renewal | Ruta 27 concession company | End of design life around 2130 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 2 or better at handback in 2033 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-BR-0001: Bridge at km 22.6, Ruta 27
Condition, people, history and liability for any road asset