Loading asset record…
Loading asset record…
€669k backlog. 3 elements past the intervention threshold.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Primary deck element | Very high | 3C | 3.1 | 3.10 | €390k |
| Pier or column | Very high | 2E | 2.7 | 2.70 | €109k |
| Cross-head or capping beam | Very high | 2C | 2.1 | 2.10 | None |
| Abutments | High | 2E | 2.7 | 2.53 | None |
| Foundations | High | 2E | 2.7 | 2.53 | None |
| Bearings | High | 2E | 2.7 | 2.53 | None |
| Expansion joints | High | 1A | 1.0 | 1.00 | None |
| Parapets and safety fences | High | 2B | 2.0 | 1.78 | None |
| Waterproofing | Medium | 2D | 2.3 | 1.89 | None |
| Superstructure drainage | Medium | 2D | 2.3 | 1.89 | None |
| Carriageway surfacing | Medium | 4B | 4.0 | 3.85 | €170k |
| Deck finishes | Medium | 2E | 2.7 | 2.36 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 24 Sep 2012 | 94 | Very good | Esteban Rojas |
| 24 Sep 2014 | 93 | Very good | Valeria Mora |
| 23 Sep 2016 | 92 | Very good | Esteban Rojas |
| 23 Sep 2018 | 88 | Very good | Valeria Mora |
| 22 Sep 2020 | 85 | Very good | Esteban Rojas |
| 22 Sep 2022 | 81 | Very good | Valeria Mora |
| 21 Sep 2024 | 76 | Good | Esteban Rojas |
| 21 Sep 2026 | 73 | Good | Valeria Mora |
Monitoring increased to quarterly until repair.
Laura JiménezGrade 2, index 73. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaCategory 2. Repaired within the contract response time.
Diego Vargas, Central Vial CRGrade 2, index 76. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaGrade 1, index 81. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaGrade 1, index 85. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaGrade 1, index 88. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaGrade 1, index 92. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2130 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 2 or better at handback in 2033 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-BR-0007: Bridge at km 69.5, Ruta 27
Condition, people, history and liability for any road asset