Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 26 Dec 2024 | 60 | Fair | Esteban Rojas |
| 26 Dec 2025 | 46 | Poor | Valeria Mora |
Category 2. Repaired within the contract response time.
Diego Vargas, Central Vial CRCategory 1. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRGrade 4, index 46. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Valeria Mora, Meseta Central IngenieríaSpares held at the maintenance depot.
Laura JiménezGrade 3, index 60. Fretting in wheel paths; ravelling at longitudinal joint.
Esteban Rojas, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Pacífico Obras Civiles | Workmanship warranty until 31 Mar 2029 |
| Renewal | Ruta 27 concession company | End of design life around 2044 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 2 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Warranty claimEarly deterioration notified under the workmanship warranty.CLM-R27PV0001-2 | Pacífico Obras Civiles | 15 Oct 2026 | €86k | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-PV-0001: Pavement section at km 5.0, Ruta 27
Condition, people, history and liability for any road asset