Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 22 Jan 2026 | 58 | Fair | Valeria Mora |
Category 2. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRAccess needs a lane closure; book overnight.
Laura JiménezGrade 3, index 58. Retroreflectivity near minimum; face fading.
Valeria Mora, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Pacífico Obras Civiles | Workmanship warranty until 31 May 2028 |
| Renewal | Ruta 27 concession company | End of design life around 2041 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-TS-0002: Traffic sign at km 5.7, Ruta 27
Condition, people, history and liability for any road asset