| Date | Index | Grade | Inspector |
|---|---|---|---|
| 1 Oct 2025 | 66 | Good | Esteban Rojas |
| 1 Oct 2026 | 59 | Fair | Valeria Mora |
Grade 3, index 59. Retroreflectivity near minimum; face fading.
Valeria Mora, Meseta Central IngenieríaCategory 2. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRGrade 2, index 66. Retroreflectivity above minimum; face clean.
Esteban Rojas, Meseta Central IngenieríaAccess needs a lane closure; book overnight.
Laura JiménezAccess needs a lane closure; book overnight.
Laura JiménezToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2028, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Due for renewal before handback; the forecast assumes it is renewed on time.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-RM-0003: Road markings at km 27.5, Ruta 27
Condition, people, history and liability for any road asset