| Date | Index | Grade | Inspector |
|---|---|---|---|
| 31 Oct 2017 | 46 | Poor | Pedro Almeida |
| 31 Oct 2018 | 43 | Poor | Sofia Pinto |
| 31 Oct 2019 | 40 | Poor | Pedro Almeida |
| 30 Oct 2020 | 35 | Poor | Sofia Pinto |
| 30 Oct 2021 | 29 | Very poor | Pedro Almeida |
| 30 Oct 2022 | 26 | Very poor | Sofia Pinto |
| 30 Oct 2023 | 22 | Very poor | Pedro Almeida |
| 29 Oct 2024 | 43 | Poor | Sofia Pinto |
| 29 Oct 2025 | 36 | Poor | Pedro Almeida |
Access needs a lane closure; book overnight.
Miguel CostaCategory 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaGrade 4, index 36. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Pedro Almeida, Estrela Inspeções TécnicasCategory 1. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaGrade 4, index 43. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Sofia Pinto, Estrela Inspeções TécnicasGrade 5, index 22. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Pedro Almeida, Estrela Inspeções TécnicasCompleted under the renewal programme. Handed over with as-built records.
Catarina Gomes, Asfaltos AtlánticoGrade 5, index 26. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Sofia Pinto, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Asfaltos Atlántico | Workmanship warranty until 18 Sep 2028 |
| Renewal | A23 Beira Interior concession company | End of design life around 2031, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Due for renewal before handback; the forecast assumes it is renewed on time.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Warranty claimEarly deterioration notified under the workmanship warranty.CLM-A23PV0002-2 | Asfaltos Atlántico | 4 Oct 2026 | €99k | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0002: Pavement section at km 30.9, A23 Beira Interior
Condition, people, history and liability for any road asset