| Date | Index | Grade | Inspector |
|---|---|---|---|
| 8 Oct 2025 | 63 | Fair | Pedro Almeida |
Monitoring increased to quarterly until repair.
Miguel CostaCategory 2. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaCondition reviewed with the grantor at the quarterly meeting.
Miguel CostaGrade 3, index 63. Retroreflectivity near minimum; face fading.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | A23 Beira Interior concession company | All warranties expired; the concession company carries the risk |
| Renewal | A23 Beira Interior concession company | End of design life around 2028, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 3 or better at handback in 2032 |
Due for renewal before handback; the forecast assumes it is renewed on time.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-RM-0004: Road markings at km 32.6, A23 Beira Interior
Condition, people, history and liability for any road asset