Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 6 Dec 2024 | 65 | Good | Sofia Pinto |
| 6 Dec 2025 | 49 | Poor | Pedro Almeida |
Category 1. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaCategory 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaAccess needs a lane closure; book overnight.
Miguel CostaGrade 4, index 49. Retroreflectivity below minimum; legend illegible at night.
Pedro Almeida, Estrela Inspeções TécnicasMonitoring increased to quarterly until repair.
Miguel CostaGrade 2, index 65. Retroreflectivity above minimum; face clean.
Sofia Pinto, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | A23 Beira Interior concession company | All warranties expired; the concession company carries the risk |
| Renewal | A23 Beira Interior concession company | End of design life around 2028, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 3 or better at handback in 2032 |
Due for renewal before handback; the forecast assumes it is renewed on time.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-RM-0002: Road markings at km 10.8, A23 Beira Interior
Condition, people, history and liability for any road asset