| Date | Index | Grade | Inspector |
|---|---|---|---|
| 3 Dec 2017 | 74 | Good | Pedro Almeida |
| 3 Dec 2018 | 68 | Good | Sofia Pinto |
| 3 Dec 2019 | 60 | Fair | Pedro Almeida |
| 2 Dec 2020 | 50 | Fair | Sofia Pinto |
| 2 Dec 2021 | 47 | Poor | Pedro Almeida |
| 2 Dec 2022 | 40 | Poor | Sofia Pinto |
| 2 Dec 2023 | 55 | Fair | Pedro Almeida |
| 1 Dec 2024 | 47 | Poor | Sofia Pinto |
| 1 Dec 2025 | 34 | Very poor | Pedro Almeida |
Monitoring increased to quarterly until repair.
Miguel CostaCategory 1. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaCategory 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaGrade 5, index 34. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Pedro Almeida, Estrela Inspeções TécnicasCondition reviewed with the grantor at the quarterly meeting.
Miguel CostaGrade 4, index 47. Rutting over 15 mm and crazing across lane 1. Skid resistance below investigatory level.
Sofia Pinto, Estrela Inspeções TécnicasGrade 3, index 55. Fretting in wheel paths; ravelling at longitudinal joint.
Pedro Almeida, Estrela Inspeções TécnicasCompleted under the renewal programme. Handed over with as-built records.
Catarina Gomes, Asfaltos AtlánticoToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Asfaltos Atlántico | Workmanship warranty until 21 Aug 2028 |
| Renewal | A23 Beira Interior concession company | End of design life around 2037 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Warranty claimEarly deterioration notified under the workmanship warranty.CLM-A23PV0003-2 | Asfaltos Atlántico | 30 Jul 2026 | €159k | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-PV-0003: Pavement section at km 34.5, A23 Beira Interior
Condition, people, history and liability for any road asset