| Date | Index | Grade | Inspector |
|---|---|---|---|
| 29 Mar 2018 | 41 | Poor | Pedro Almeida |
| 29 Mar 2019 | 42 | Poor | Sofia Pinto |
| 28 Mar 2020 | 38 | Poor | Pedro Almeida |
| 28 Mar 2021 | 39 | Poor | Sofia Pinto |
| 28 Mar 2022 | 34 | Very poor | Pedro Almeida |
| 28 Mar 2023 | 33 | Very poor | Sofia Pinto |
| 27 Mar 2024 | 32 | Very poor | Pedro Almeida |
| 27 Mar 2025 | 55 | Fair | Sofia Pinto |
| 27 Mar 2026 | 49 | Poor | Pedro Almeida |
Category 1. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaMonitoring increased to quarterly until repair.
Miguel CostaGrade 4, index 49. Beam height below 600 mm over 40 m; terminal damaged.
Pedro Almeida, Estrela Inspeções TécnicasCategory 2. Repaired within the contract response time.
Catarina Gomes, Beira Conservação ViáriaAdded to the next renewal programme for scoping.
Miguel CostaGrade 3, index 55. Surface corrosion on posts; two bolts missing.
Sofia Pinto, Estrela Inspeções TécnicasCompleted under the renewal programme. Handed over with as-built records.
Catarina Gomes, Guardline SystemsGrade 5, index 32. Beam height below 600 mm over 40 m; terminal damaged.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Guardline Systems | Workmanship warranty until 14 Sep 2027 |
| Renewal | A23 Beira Interior concession company | End of design life around 2030, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 3 or better at handback in 2032 |
Due for renewal before handback; the forecast assumes it is renewed on time.
| Claim | Against | Raised | Amount | Status |
|---|---|---|---|---|
| Warranty claimEarly deterioration notified under the workmanship warranty.CLM-A23SB0002-2 | Guardline Systems | 27 Oct 2026 | €16k | Open |
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-SB-0002: Safety barrier at km 6.4, A23 Beira Interior