| Date | Index | Grade | Inspector |
|---|---|---|---|
| 2 Nov 2017 | 72 | Good | Paula Serrano |
| 2 Nov 2018 | 72 | Good | Álvaro Gil |
| 2 Nov 2019 | 69 | Good | Paula Serrano |
| 1 Nov 2020 | 67 | Good | Álvaro Gil |
| 1 Nov 2021 | 66 | Good | Paula Serrano |
| 1 Nov 2022 | 64 | Fair | Álvaro Gil |
| 1 Nov 2023 | 60 | Fair | Paula Serrano |
| 31 Oct 2024 | 57 | Fair | Álvaro Gil |
| 31 Oct 2025 | 54 | Fair | Paula Serrano |
Category 2. Made safe; permanent repair scheduled.
Javier Moreno, Meseta MantenimientoGrade 3, index 54. Surface corrosion on posts; two bolts missing.
Paula Serrano, Castilla IngenieríaMonitoring increased to quarterly until repair.
Carmen OrtegaAsset data checked against as-built drawings.
Carmen OrtegaGrade 3, index 57. Surface corrosion on posts; two bolts missing.
Álvaro Gil, Castilla IngenieríaGrade 3, index 60. Surface corrosion on posts; two bolts missing.
Paula Serrano, Castilla IngenieríaGrade 3, index 64. Surface corrosion on posts; two bolts missing.
Álvaro Gil, Castilla IngenieríaGrade 2, index 66. Beam height and post spacing compliant.
Paula Serrano, Castilla IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Meseta Mantenimiento | Operations and maintenance contract, performance-based |
| Defects | Concesiones de Madrid concession company | All warranties expired; the concession company carries the risk |
| Renewal | Concesiones de Madrid concession company | End of design life around 2031 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Concesiones de Madrid concession company | Grade 3 or better at handback in 2029 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record MAD-SB-0005: Safety barrier at km 11.3, Concesiones de Madrid
Condition, people, history and liability for any road asset