| Date | Index | Grade | Inspector |
|---|---|---|---|
| 13 Jan 2026 | 55 | Fair | Valeria Mora |
Access needs a lane closure; book overnight.
Laura JiménezCategory 2. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRGrade 3, index 55. Surface corrosion on posts; two bolts missing.
Valeria Mora, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Guardline Systems | Manufacturer warranty until 30 Apr 2028 |
| Renewal | Ruta 27 concession company | End of design life around 2040 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-CC-0002: Crash cushion at km 32.8, Ruta 27
Condition, people, history and liability for any road asset