| Date | Index | Grade | Inspector |
|---|---|---|---|
| 17 Aug 2018 | 71 | Good | Valeria Mora |
| 17 Aug 2019 | 64 | Fair | Esteban Rojas |
| 16 Aug 2020 | 61 | Fair | Valeria Mora |
| 16 Aug 2021 | 53 | Fair | Esteban Rojas |
| 16 Aug 2022 | 50 | Fair | Valeria Mora |
| 16 Aug 2023 | 42 | Poor | Esteban Rojas |
| 15 Aug 2024 | 39 | Poor | Valeria Mora |
| 15 Aug 2025 | 33 | Very poor | Esteban Rojas |
| 15 Aug 2026 | 24 | Very poor | Valeria Mora |
Spares held at the maintenance depot.
Laura JiménezGrade 5, index 24. Carrier pipe partly collapsed; ponding on hard shoulder after rain.
Valeria Mora, Meseta Central IngenieríaCategory 1. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRCategory 2. Repaired within the contract response time.
Diego Vargas, Central Vial CRGrade 5, index 33. Carrier pipe partly collapsed; ponding on hard shoulder after rain.
Esteban Rojas, Meseta Central IngenieríaGrade 4, index 39. Carrier pipe partly collapsed; ponding on hard shoulder after rain.
Valeria Mora, Meseta Central IngenieríaGrade 4, index 42. Carrier pipe partly collapsed; ponding on hard shoulder after rain.
Esteban Rojas, Meseta Central IngenieríaGrade 3, index 50. Silt at 30% of gullies; minor root ingress.
Valeria Mora, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2063 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-DR-0001: Drainage run at km 2.5, Ruta 27
Condition, people, history and liability for any road asset