Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 24 May 2021 | 78 | Good | Esteban Rojas |
| 24 May 2022 | 70 | Good | Valeria Mora |
| 24 May 2023 | 63 | Fair | Esteban Rojas |
| 23 May 2024 | 56 | Fair | Valeria Mora |
| 23 May 2025 | 48 | Poor | Esteban Rojas |
| 23 May 2026 | 40 | Poor | Valeria Mora |
Category 1. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRCategory 2. Repaired within the contract response time.
Diego Vargas, Central Vial CRGrade 4, index 40. Beam height below 600 mm over 40 m; terminal damaged.
Valeria Mora, Meseta Central IngenieríaSpares held at the maintenance depot.
Laura JiménezGrade 4, index 48. Beam height below 600 mm over 40 m; terminal damaged.
Esteban Rojas, Meseta Central IngenieríaGrade 3, index 56. Surface corrosion on posts; two bolts missing.
Valeria Mora, Meseta Central IngenieríaGrade 3, index 63. Surface corrosion on posts; two bolts missing.
Esteban Rojas, Meseta Central IngenieríaGrade 2, index 70. Beam height and post spacing compliant.
Valeria Mora, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2045 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-SB-0001: Safety barrier at km 1.3, Ruta 27
Condition, people, history and liability for any road asset