Loading asset record…
Loading asset record…
€8,840 backlog. 2 elements past the intervention threshold.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Truss, beams or cantilever | Very high | 2D | 2.3 | 2.30 | None |
| Columns and legs | Very high | 2E | 2.7 | 2.70 | €5,690 |
| Base connections | Very high | 3B | 3.0 | 3.00 | €3,150 |
| Foundations | High | 1A | 1.0 | 1.00 | None |
| Access walkway | High | 1A | 1.0 | 1.00 | None |
| Handrails and guard rails | High | 1A | 1.0 | 1.00 | None |
| Truss finishes | Medium | 2E | 2.7 | 2.36 | None |
| Column finishes | Medium | 3C | 3.1 | 2.82 | None |
| Sign and signal supports | Medium | 2D | 2.3 | 1.89 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 28 Aug 2011 | 99 | Very good | Esteban Rojas |
| 27 Aug 2013 | 100 | Very good | Valeria Mora |
| 27 Aug 2015 | 94 | Very good | Esteban Rojas |
| 26 Aug 2017 | 90 | Very good | Valeria Mora |
| 26 Aug 2019 | 90 | Very good | Esteban Rojas |
| 25 Aug 2021 | 85 | Very good | Valeria Mora |
| 25 Aug 2023 | 86 | Very good | Esteban Rojas |
| 24 Aug 2025 | 80 | Very good | Valeria Mora |
Added to the next renewal programme for scoping.
Laura JiménezAsset data checked against as-built drawings.
Laura JiménezGrade 1, index 80. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaGrade 1, index 86. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaGrade 1, index 85. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaGrade 1, index 90. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaGrade 1, index 90. No significant defects. Bearings and joints performing.
Valeria Mora, Meseta Central IngenieríaGrade 1, index 94. No significant defects. Bearings and joints performing.
Esteban Rojas, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2050 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 2 or better at handback in 2033 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-GN-0002: Sign gantry at km 11.9, Ruta 27
Condition, people, history and liability for any road asset