| Date | Index | Grade | Inspector |
|---|---|---|---|
| 25 Mar 2023 | 58 | Fair | Esteban Rojas |
| 24 Mar 2024 | 51 | Fair | Valeria Mora |
| 24 Mar 2025 | 46 | Poor | Esteban Rojas |
| 24 Mar 2026 | 34 | Very poor | Valeria Mora |
Category 2. Repaired within the contract response time.
Diego Vargas, Central Vial CRCategory 1. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRGrade 5, index 34. Repeated faults; availability below 95% this quarter.
Valeria Mora, Meseta Central IngenieríaSpares held at the maintenance depot.
Laura JiménezGrade 4, index 46. Repeated faults; availability below 95% this quarter.
Esteban Rojas, Meseta Central IngenieríaGrade 3, index 51. Intermittent comms drop-outs logged; within availability target.
Valeria Mora, Meseta Central IngenieríaGrade 3, index 58. Intermittent comms drop-outs logged; within availability target.
Esteban Rojas, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Ruta 27 concession company | All warranties expired; the concession company carries the risk |
| Renewal | Ruta 27 concession company | End of design life around 2034 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-SO-0003: Emergency phone at km 35.5, Ruta 27
Condition, people, history and liability for any road asset