| Date | Index | Grade | Inspector |
|---|---|---|---|
| 21 Aug 2022 | 79 | Good | Valeria Mora |
| 21 Aug 2023 | 74 | Good | Esteban Rojas |
| 20 Aug 2024 | 66 | Good | Valeria Mora |
| 20 Aug 2025 | 59 | Fair | Esteban Rojas |
| 20 Aug 2026 | 50 | Fair | Valeria Mora |
Grade 3, index 50. Surface corrosion on posts; two bolts missing.
Valeria Mora, Meseta Central IngenieríaCategory 2. Made safe; permanent repair scheduled.
Diego Vargas, Central Vial CRMonitoring increased to quarterly until repair.
Laura JiménezGrade 3, index 59. Surface corrosion on posts; two bolts missing.
Esteban Rojas, Meseta Central IngenieríaMonitoring increased to quarterly until repair.
Laura JiménezGrade 2, index 66. Beam height and post spacing compliant.
Valeria Mora, Meseta Central IngenieríaGrade 2, index 74. Beam height and post spacing compliant.
Esteban Rojas, Meseta Central IngenieríaGrade 2, index 79. Beam height and post spacing compliant.
Valeria Mora, Meseta Central IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Central Vial CR | Operations and maintenance contract, performance-based |
| Defects | Guardline Systems | Manufacturer warranty until 30 May 2028 |
| Renewal | Ruta 27 concession company | End of design life around 2036 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Ruta 27 concession company | Grade 3 or better at handback in 2033 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record R27-CC-0003: Crash cushion at km 36.9, Ruta 27