€438k backlog. 3 elements past the intervention threshold, plus €4,500 for the overdue principal inspection.
| Element | Importance | Condition (severity and extent) | ECS (element condition score) | ECI (element condition index) | Backlog |
|---|---|---|---|---|---|
| Primary deck element | Very high | 2D | 2.3 | 2.30 | None |
| Pier or column | Very high | 2E | 2.7 | 2.70 | €183k |
| Cross-head or capping beam | Very high | 3C | 3.1 | 3.10 | €139k |
| Abutments | High | 2E | 2.7 | 2.53 | None |
| Foundations | High | 2B | 2.0 | 1.78 | None |
| Bearings | High | 3D | 3.3 | 3.17 | €111k |
| Expansion joints | High | 2E | 2.7 | 2.53 | None |
| Parapets and safety fences | High | 2C | 2.1 | 1.88 | None |
| Waterproofing | Medium | 3D | 3.3 | 3.05 | None |
| Superstructure drainage | Medium | 2D | 2.3 | 1.89 | None |
| Carriageway surfacing | Medium | 2D | 2.3 | 1.89 | None |
| Deck finishes | Medium | 2B | 2.0 | 1.55 | None |
Condition PI after the CSS Bridges Group guidance for highway structures (2007). Its bands (very good from 90, good 80, fair 65, poor 40) are stricter than the platform grades. Element value shares, intervention thresholds and repair costs are illustrative assumptions.
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 21 Sep 2008 | 66 | Good | Pedro Almeida |
| 21 Sep 2010 | 63 | Fair | Sofia Pinto |
| 20 Sep 2012 | 64 | Fair | Pedro Almeida |
| 20 Sep 2014 | 61 | Fair | Sofia Pinto |
| 19 Sep 2016 | 56 | Fair | Pedro Almeida |
| 19 Sep 2018 | 54 | Fair | Sofia Pinto |
| 18 Sep 2020 | 54 | Fair | Pedro Almeida |
| 18 Sep 2022 | 51 | Fair | Sofia Pinto |
| 17 Sep 2024 | 72 | Good | Pedro Almeida |
Spares held at the maintenance depot.
Miguel CostaGrade 2, index 72. No significant defects. Bearings and joints performing.
Pedro Almeida, Estrela Inspeções TécnicasCompleted under the renewal programme. Handed over with as-built records.
Catarina Gomes, Pontis StructuralGrade 3, index 51. Minor spalling to deck soffit; joint seals hardening.
Sofia Pinto, Estrela Inspeções TécnicasGrade 3, index 54. Minor spalling to deck soffit; joint seals hardening.
Pedro Almeida, Estrela Inspeções TécnicasGrade 3, index 54. Minor spalling to deck soffit; joint seals hardening.
Sofia Pinto, Estrela Inspeções TécnicasGrade 3, index 56. Minor spalling to deck soffit; joint seals hardening.
Pedro Almeida, Estrela Inspeções TécnicasGrade 3, index 61. Minor spalling to deck soffit; joint seals hardening.
Sofia Pinto, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Pontis Structural | Latent defects cover until 24 Oct 2033 |
| Renewal | A23 Beira Interior concession company | End of design life around 2124 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 2 or better at handback in 2032 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-BR-0003: Bridge at km 35.4, A23 Beira Interior