| Date | Index | Grade | Inspector |
|---|---|---|---|
| 8 Nov 2023 | 76 | Good | Pedro Almeida |
| 7 Nov 2024 | 71 | Good | Sofia Pinto |
| 7 Nov 2025 | 57 | Fair | Pedro Almeida |
Category 2. Made safe; permanent repair scheduled.
Catarina Gomes, Beira Conservação ViáriaGrade 3, index 57. Intermittent comms drop-outs logged; within availability target.
Pedro Almeida, Estrela Inspeções TécnicasCondition reviewed with the grantor at the quarterly meeting.
Miguel CostaGrade 2, index 71. All functions tested and working.
Sofia Pinto, Estrela Inspeções TécnicasGrade 2, index 76. All functions tested and working.
Pedro Almeida, Estrela Inspeções TécnicasToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Beira Conservação Viária | Operations and maintenance contract, performance-based |
| Defects | Lumenroad | Manufacturer warranty until 30 Aug 2030 |
| Renewal | A23 Beira Interior concession company | End of design life around 2048 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | A23 Beira Interior concession company | Grade 3 or better at handback in 2032 |
Forecast to fall short of the handback standard. Plan renewal or major maintenance before handback.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record A23-LC-0003: Lighting column at km 21.4, A23 Beira Interior