Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 25 Mar 2024 | 99 | Very good | Paula Serrano |
| 25 Mar 2025 | 99 | Very good | Álvaro Gil |
| 25 Mar 2026 | 98 | Very good | Paula Serrano |
Asset data checked against as-built drawings.
Carmen OrtegaMonitoring increased to quarterly until repair.
Carmen OrtegaGrade 1, index 98. Surface sound, texture depth within limits.
Paula Serrano, Castilla IngenieríaGrade 1, index 99. Surface sound, texture depth within limits.
Álvaro Gil, Castilla IngenieríaGrade 1, index 99. Surface sound, texture depth within limits.
Paula Serrano, Castilla IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Meseta Mantenimiento | Operations and maintenance contract, performance-based |
| Defects | Manzanares Obras | Workmanship warranty until 30 May 2028 |
| Renewal | Concesiones de Madrid concession company | End of design life around 2043 |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Concesiones de Madrid concession company | Grade 2 or better at handback in 2029 |
Forecast to meet the handback standard at the current rate of wear.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record MAD-PV-0001: Pavement section at km 0.1, Concesiones de Madrid
Condition, people, history and liability for any road asset