Loading asset record…
Loading asset record…
| Date | Index | Grade | Inspector |
|---|---|---|---|
| 23 Mar 2024 | 98 | Very good | Paula Serrano |
| 23 Mar 2025 | 99 | Very good | Álvaro Gil |
| 23 Mar 2026 | 98 | Very good | Paula Serrano |
Monitoring increased to quarterly until repair.
Carmen OrtegaGrade 1, index 98. Retroreflectivity above minimum; face clean.
Paula Serrano, Castilla IngenieríaGrade 1, index 99. Retroreflectivity above minimum; face clean.
Álvaro Gil, Castilla IngenieríaGrade 1, index 98. Retroreflectivity above minimum; face clean.
Paula Serrano, Castilla IngenieríaToday
| Liability | Responsible | Terms |
|---|---|---|
| Routine maintenance | Meseta Mantenimiento | Operations and maintenance contract, performance-based |
| Defects | Concesiones de Madrid concession company | All warranties expired; the concession company carries the risk |
| Renewal | Concesiones de Madrid concession company | End of design life around 2027, before handback |
| Third-party damage | Meridian Infrastructure Insurance | Costs recovered from the at-fault party where known; €5,000 excess |
| Handback condition | Concesiones de Madrid concession company | Grade 3 or better at handback in 2029 |
Due for renewal before handback; the forecast assumes it is renewed on time.
No claims recorded against this asset.
Illustrative record generated for the demo. Names, organisations, contacts, dates and amounts are fictional.
Asset record MAD-RM-0002: Road markings at km 4.9, Concesiones de Madrid
Condition, people, history and liability for any road asset