Condition, people, history and liability for any road asset
You said: Which high-criticality assets are in poor condition?
Searched assets: all concessions, Structures, grades 4, 5, high criticality
Based on the demo data, six high-criticality assets in your Structures view are in poor condition: five in A23 Beira Interior and one in Ruta 27.
| Asset | Concession | Condition | Replacement value | Warranty | Open claims |
|---|---|---|---|---|---|
| A23-GN-0002 (opens in new tab) — Sign gantry at km 20.2 | A23 Beira Interior | 4 (Poor) | €180k | Active | 1 |
| A23-CV-0010 (opens in new tab) — Culvert at km 144.6 | A23 Beira Interior | 4 (Poor) | €200k | Active | 1 |
| A23-CV-0005 (opens in new tab) — Culvert at km 101.0 | A23 Beira Interior | 4 (Poor) | €56k | Expired | 0 |
| A23-CV-0008 (opens in new tab) — Culvert at km 129.8 | A23 Beira Interior | 4 (Poor) | €165k | Expired | 0 |
| A23-RW-0003 (opens in new tab) — Retaining wall at km 70.2 | A23 Beira Interior | 4 (Poor) | €151k | Active | 1 |
| R27-CV-0002 (opens in new tab) — Culvert at km 38.0 | Ruta 27 | 4 (Poor) | €109k | Active | 1 |
Together they represent €860k in replacement value, with four open claims worth €59k. Each has one open defect; none has an overdue inspection. All six are flagged for handback risk by the demo-generated forecast.